top of page

Create Your First Project

Start adding your projects to your portfolio. Click on "Manage Projects" to get started

Union Centre Blvd DDI

Project type

Traffic Signals, Lighting Design, Signal & Lighting Inspection

Date

2017

Location

West Chester, Ohio

TEC provided traffic signal design and lighting design services in association with Jacobs Engineering for a Diverging Diamond Interchange (DDI) project. Our team designed a new mast arm signal at the intersection of I-75 SB Ramp and Union Center Blvd, and at the intersection of I-75 NB Ramp and Union Center Blvd. The traffic signal design included: General notes specific to traffic signal construction, including specifications on signal heads, etc., per ODOT and Butler County standards • Detailed construction drawings with specifications, general notes, quantities, details, materials, wiring diagram, and signal phasing plan • Signal timing plans with detailed timing for each ramp signal • Details regarding interconnect between ramp signals and any adjacent signals. TEC’s lighting design services included: preparation of construction plans to replace the existing lighting on Union Center Blvd • Decorative lighting plans for the bridge area • Stakeholder/utility coordination • Photometric analysis • Power service location and coordination • Stage 2 lighting design (details and specifications including foundations, conduits, wiring, control apparatus and equipment location) • Stage 3 lighting design (additional details including quantities, notes and final lighting details).

bottom of page