top of page

Transportation & Traffic Solutions
Designed With Precision

Civil Engineers Serving You Since 1992
norwood-oh-4.jpg
Municipal Engineering
Glendale Milford (6 of 22)_edited.jpg
Traffic
Signals
Roadway Design
EngStudies_3_edited.jpg
Engineering
Studies
Screenshot 2025-08-19 145700_edited.jpg
Intelligent
Transportation
Systems
Lighting
Design

Our Mission

"Our mission is to provide excellent service to our clients, maintain a professional working environment for our staff and be a productive member of our community."

Our Vision

"Our vision is to strengthen communities and support long-term growth by transforming ideas into infrastructure through innovation, collaboration, and precision."

IMG_2599.jpg

$160,000,000+

Grant Funding Secured

1000+

Signals Retimed

Glendale-VillageSquare-8454.jpg

4,500+ 

Projects Completed

Installation of a 12" ductile pipe is currently underway for the Montgomery Road Waterline project in Norwood. TEC designed the waterline, preformed survey, supported the City with OPWC grant assistance, and is currently providing construction administration.

Installation of a 12" ductile pipe is currently underway for the Montgomery Road Waterline project in Norwood. TEC designed the waterline, preformed survey, supported the City with OPWC grant assistance, and is currently providing construction administration.

DryFork_I74EB Looking NE2.JPG

February 2026
Featured Project

Dry Fork Road Interchange Improvements

City of Harrison, Ohio

TEC Engineering provided engineering design services for the Dry Fork Road and I-74 interchange improvement project in the City of Harrison. The project enhances regional connectivity, improves traffic operations and safety, and supports long-term economic development.

TEC’s services included surveying, roadway and bridge design, traffic signal design, utility coordination, lighting design, maintenance of traffic planning, and overall project coordination. TEC also assisted the City with grant support, which helped secure funding through the State Transportation Block Grant (STBG), Ohio Public Works Commission (OPWC), Transportation Systems Management and Operations (TSMO), and Transportation Review Advisory Council (TRAC) programs. Design is complete and construction is planned to begin in the spring.

bottom of page