
Installation of a 12" ductile pipe is currently underway for the Montgomery Road Waterline project in Norwood. TEC designed the waterline, preformed survey, supported the City with OPWC grant assistance, and is currently providing construction administration.
Installation of a 12" ductile pipe is currently underway for the Montgomery Road Waterline project in Norwood. TEC designed the waterline, preformed survey, supported the City with OPWC grant assistance, and is currently providing construction administration.

July 2026
Featured Project
Euclid Road Sidewalk Project
Sycamore Township, Ohio
TEC conducted a full topographic survey of the Euclid Road project area in Sycamore Township, including utility research, right-of-way review, control and level loops, and development of a CAD basemap. Based on the survey, TEC completed Stage 1, Stage 2, Stage 3, and final construction plans for sidewalk improvements on the north side of Euclid Road, including drainage design, with all design work performed in OpenRoads Designer and CAD files submitted to the Township. Utility coordination was conducted during design, and stormwater design was included as needed, while all other utility design was handled by the utility owner. Plans were submitted to the Township for review prior to County submission, and all work was completed within Sycamore Township boundaries, excluding right-of-way plats or legal descriptions. Within this project, part of Euclid was rehabilitated, TEC provided striping plans.









