Uncategorized

/Uncategorized

Good to Know: Why Manage Assets?

2019-07-12T10:43:30+00:00

July 12, 2019 | Written by Kellie Linville, PE Do you have culvert records in a filing cabinet, sign records in an old database program, pavement condition records in a shapefile, and guardrail records in Excel? When repaving a road, wouldn’t you like your crews to know about the failing culvert located underneath so it

Good to Know: Why Manage Assets?2019-07-12T10:43:30+00:00

Congratulations to New RSPs

2019-07-12T11:23:19+00:00

TEC congratulates Edward Williams and Andrea Harth on earning their Road Safety Professional (RSP) certifications!  This is a new certification offered through the Transportation Professional Certification Board (TPCB).  Learn more here: http://www.tpcb.org/rsp/

Congratulations to New RSPs2019-07-12T11:23:19+00:00

Newest TEC Professional Engineer

2019-07-12T11:25:30+00:00

TEC is proud to congratulate Dylan Osborn for receiving his Professional Engineer (PE) certification! Dylan has worked at TEC since 2014. He is responsible for signal design, signal timing, asset management data collection, data analysis, and engineering studies.

Newest TEC Professional Engineer2019-07-12T11:25:30+00:00

TEC Appoints New Associates

2019-07-12T11:26:34+00:00

TEC Engineering, Inc. is pleased to announce the appointment of our newest Associates. Each is a long-time employee that has played an instrumental role in the growth and success of the firm. Each has shown a strong commitment to providing exceptional client service and design quality. Andrea Harth Andrea began her career with TEC in 2003

TEC Appoints New Associates2019-07-12T11:26:34+00:00

TEC’s DMS Design Project in Cincinnati

2019-01-09T13:28:22+00:00

TEC completed the design and installation of Dynamic Message Signs (DMS) on Cincinnati and ODOT fiber to address congestion from two downtown sports arenas and entertainment district at The Banks.  Phase I consisted of installation of two Freeway Dynamic Message Signs (DMS) on SB 1-75 and I-71. Phase II involved installation of four additional signs over

TEC’s DMS Design Project in Cincinnati2019-01-09T13:28:22+00:00